Road work will begin in the next week, so DRIVE SAFELY, at watch for the equipment and trucks.
Alton Shore has been contacted to bring in additional rock, and to shape the roadway.
He will also be working in the ditches and drainage areas, to clear and open them before the winter snows begin.
It was voted at the annual meeting to get this work done before the real bad weather gets here. There should be additional work that will be done in the spring and summer months.
Again, DRIVE SAFELY AND WATCH FOR EQUIPMENT.