WRC Eng. Approach - June 20th

Posted in: Foxfield
TOWN OF FOXFIELD
ROADWAY PAVING PROJECT

WRC?’S ENGINEERING APPROACH

1. Meet with Roads Committee to initiate information gathering/alternatives discussion

2. Develop Roads Paving Criteria/ Options
A) Pavement Types
B) Pavement Thickness
C) Pavement Width
D) Shoulder Width/ Material
E) Construction Options
F) Vertical/Horizontal Alignment

3. Develop Criteria/Options for Ancillary issues
A) Roadway Drainage
B) Driveway Tie-ins
C) Traffic Calming
D) Pedestrian Paths
E) Horse Paths
F) Entrance Signs / Landscaping
G) Access control

4. Develop Conceptual Cost Estimates for Options

5. Discuss Criteria/Concepts/Options/Costs with Roads Committee

6. Prepare Flyer on Committee Selected Options for Distribution to Residents

7. Conduct Public Meeting on Options/Costs

8. Prepare Final Cost Estimates for Ballot Issue

9. If Ballot Issue Successful, Prepare Plans And Specifications for Construction

10. Proceed Through Public Bidding Process; Select Lowest Responsible Bidder

11. Construct Project

Advertise Here!

Promote Your Business or Product for $10/mo

istockphoto_1682638-attention.jpg

For just $10/mo you can promote your business or product directly to nearby residents. Buy 12 months and save 50%!

Buynow