We have several parts of the streets within the community that have had repair actions begun, several of these areas were started over a week ago and no actions have been taken except to remove the old concrete and leave an area that is gathering water and becoming a breeding ground for misquitoes. The repair action on Sunset Drive was started nearly a month ago and has a large strip without concrete, when will that be repaired? Is our management association doing anything to get this situation corrected?